When it comes to flooring installation, proper preparation of the subfloor is crucial to ensure a long-lasting, even, and stable flooring surface. One method often used to achieve a level subfloor is the application of leveling compound. However, many homeowners and DIY enthusiasts are unsure whether it is possible to apply flooring over fresh leveling compound. In this article, we will explore this topic in detail and provide you with the information you need to make informed decisions for your flooring project.
Understanding Leveling Compound
Before delving into the topic of applying flooring over fresh leveling compound, it’s essential to understand what leveling compound is and its purpose. Leveling compound, also known as self-leveling or floor leveling compound, is a cementitious material used to level uneven or damaged subfloors. It is typically a mixture of cement, fine aggregates, and polymers, which allows it to flow and self-level when applied.
The Drying Process
Fresh leveling compound requires adequate time to dry and cure before any flooring can be installed on top. The drying time can vary depending on various factors such as the product used, the thickness of the application, humidity levels, and temperature. It is crucial to follow the manufacturer’s instructions regarding drying time, as they are best equipped to provide accurate recommendations. Typically, leveling compound can take anywhere from a few hours to several days to dry completely.
Applying Flooring Over Fresh Leveling Compound
Once the leveling compound has fully dried and cured, it is safe to proceed with installing your chosen flooring material. However, there are some considerations and steps to follow to ensure a successful installation.
1. Check the Moisture Level
Before installing any flooring, it is vital to check the moisture level of the leveling compound. Excess moisture can cause issues such as warping, buckling, or adhesive failure. There are various moisture testing methods available, including moisture meters and calcium chloride tests. Ensure that the moisture levels are within the acceptable range specified by the flooring manufacturer.
2. Prime the Surface
Before installing your flooring, it is advisable to prime the surface of the leveling compound. Priming helps to seal the surface, providing better adhesion between the subfloor and the flooring material. Use a primer recommended by the flooring manufacturer and follow the application instructions carefully.
3. Choose the Right Adhesive
When applying flooring over the leveled surface, it is crucial to select the appropriate adhesive based on the type of flooring you are installing. Different flooring materials require specific types of adhesives. Consult the flooring manufacturer’s recommendations for the best adhesive to use for your particular flooring choice.
4. Follow the Flooring Installation Instructions
Finally, it is imperative to follow the specific installation instructions provided by the flooring manufacturer. Different types of flooring require specific methods and tools for installation. By following these instructions, you can ensure a successful and long-lasting flooring installation.
Applying flooring over fresh leveling compound is possible, provided that the leveling compound has fully dried and cured. It is essential to check the moisture levels, prime the surface, choose the right adhesive, and follow the flooring manufacturer’s installation instructions. By following these steps, you can achieve a level, stable, and durable flooring surface that will enhance the beauty and functionality of your space for years to come.
